image Infeed line on RDC image Infeed line on FBDC

N.E. Engineering Spa N.E. Engineering Spa

Infeed line on FFG

Drop us a line...

Send Message
Project Details

Infeed line on FFG
(Argentina )
This in-feed line has been designed in order to optimize the buffer upstream the converting machine, and the cycle time of the shuttle car. For this reason the shuttle car discharges two stacks at the time, and later the right angle device moves one stack at the time on center of the line.

Recent Entries

N.E. Engineering SPA

Via Leccio 25A
55016 Porcari (Lucca) - Italy
Tel. +39 0583 21051
Vat Code IT01395290461
Email comm@ne-engineering.com
Website ne-engineering.com

Latest News